Take advantage of the experiential-learning opportunities built into many programs.

Cabot Circus

Supplied and installed 1.6km of LED neon rope light. This was a challenging project where various forms of access equipment was required and even an abseiling team for the almost impossible places to reach. The materials used was a mains voltage 230v Neon LED meaning that long lengths of LED

Wales and West Utilities

Supplied and installed 50kw solar PV at the WWU HQ building. This was mounted using a roof mounting system fixed directly to the sheet metal using rails with a sealing strips and fixings. Also mounted a solar display in the reception area so visitors can see the amount energy produced

Avon Fire Lansdown Control

Supplied and installed 28kw solar PV system, 105 x 265w modules using a large scale non-penetration roof system which uses ballast weights as support. This was mounted on top of and old bunker which has been converted for training for Avon Fire and Rescue service. It is also adjacent to

WWU Caradog House Newport

Complete fit out of open plan office area including full electrical rewire, new LED lighting, creation of meeting rooms with glass panelling, new kitchen with wood flooring. This building is being used as an overflow to the main building and all effort was put in to ensure it had the